Survey of North American Water/Wastewater DBO Projects

From Public Works Financing
For this and other full stories subscribe to PWFinaancing by calling 908-654-0397

Copyrighted Material

Do not reproduce without express permission of Public Works Financing: 908-654-0397

Arvin, Calif.: 35-yr. DBO of 2-mgd wastewater treatment plant. USFOS $54m DBOM fees and costs with $5.5m in capital and   corporate financing by USFOS. Awarded 7/98.
Wilmington, Del.: 20-yr. lease on 90-mgd wastewater treatment plant slated for expansion to 132 mgd USFOS $1 m concession fee to city for transaction costs; $1 2m capital investment; $1 64m in fees and costs. Signed 12/97.
Honolulu, Haw.: 20-yr. DBO 12-mgd reverse osmosis reclamation facility USFOS $140m in fees and costs. Awarded 10/98.
Leominster, Mass.: 20-yr. DBO water and wastewater plants USFOS Financed with USFOS and has $36m in fees; $4.lm turnkey upgrade of both systems. Signed 11/96.
Lynn, Mass.: Turnkey implementation of a combined sewer overflow solution to CSO problem USFOS (CSO); Aqua Alliance (con-ops) $60m capital. Selected preferred bidders 12/99.
Plymouth, Mass.: 20-yr. DBO 3-mgd wastewater plant USFOS $45m in fees and costs. Awarded 6/99.
Taunton, Mass.: 20-yr. service contract to upgrade and operate 8.3-mgd wastewater treatment plant USFOS $50m in fees and costs. Signed 8/98.
Moncton, NB, Canada: 20-yr. BOT of 27-mgd water filtration plant USFOS
(Hardman Group)
$59.5m capital. Awarded 5/98.
Washington Borough, NJ: 15-yr. DBO for 1 .5-mgd wastewater treatment plant USFOS $17.9m in fees; $8.2m capital. Awarded 6/98.
Franklin, Oh.: 20-yr. BOT 4.5-mgd wastewater treatment plant USFOS $6.8m capital investment to purchase and $1.7m in fees. Signed 8/95.
Montgomery County Pa.: 20-yr. OM&M/ DBO regional wastewater plant. Expansion to 12.8 mgd USFOS $30m in capital with $66m in fees and costs.
Awarded 1/99.
Cranston, RI: 25-yr. lease/BOT of $24m wastewater facility excluding AWT upgrade of 23-mgd wastewater system. USFOS/
Metcalf & Eddy/
Poseidon Resources
$400m in fees and costs with $48.1 m up-front contract payment to city. Awarded 1 2/96.
Woonsocket, RI: 20-yr. DBO 16-mgd wastewater treatment plant USFOS $22.4m in capital and soft costs plus a $3.9m concessionfee; $75m in costs and fees. Awarded 4/99
Freeport, Tex.: 20-yr. OM&M upgrade of 1 .5-mgd sewerage system and 2.6mgd water plant USFOS/
Metcalf & Eddy
$45m in fees and costs. Signed 4/95.
Guam. 20-yr DBO 3-mgd water plant and distribution system Earth Tech $45m capital. Under construction 1999.
Oak Grove, Ky.: 10-yr. OM&M; DB water plant improvements Earth Tech $4m in fees; $lm capital. Signed in 1998.
Gardiner, Mass: 20-yr. op., repair, replace 3.5-mgd water and 5-mgd ww systems; DBO new 3-mgd water filtration Earth Tech $100m in fees and costs. Awarded 11/98.
Traverse City, Mich.: DBO water system Earth Tech $6.8m capital. Awarded 7/97.
Franklin, Oh.: 20-yr. service contract DBO 5-mgd expansion of water plant Earth Tech $15m capital. Started 10/97.
Bessemer, Ala.: 20-yr. DBO 12-mgd water plant and trunk main Ogden Water $63m in fees and costs. Awarded 6/98.
Monroe County, FIa.: 20-yr DBO regional wastewater plant, pipes for Key Largo under evaluation. Ogden Water $58m capital, $3m/yr. O&M. Low bidder 1/2000,
Bakersfield, Calif.: BOO an initially  lO-mgd water treatment plant; to reach 60 mgd at build-out California
Water Service Co.
$20m capital. Signed 3/99.
San Diego. Calif.: 20-yr. BOT sludge pelletizer at Miramar Naval Air Station Water Tech. Wheelabrator $20m capital. Commercial operation in 1998
Rangeview Metro District, Colo.: 85-yr. DBO wastewater treatment plant PureCycle Corp. Cost NA. Signed 1/97.
Tampa Bay, FIa.: 30-yr. BOT 35-mgd RO desalination plant Poseidon Res./
Stone & Webster
$120m capital. Signed 7/99.
Mt. Vernon, Ill.: BOT 5-mgd expansion of a sewage treatment plant under a 20-yr. O&M contract Environmental
Mgmt. Corp./
Paric Corp.
$6.64m capital. Commercial operation in 1988.
Greater Lawrence, Mass.: 20-yr. DBO sludge processing plant New England
Fertilizer Co.
$49m capital; $17m 1st yr. fee. Awarded 1998.
Edison, NJ: 20-yr. upgrade and O&M a 9-5-mgd water system Elizabethtown
Water Co.
$120m in fees and costs. Signed 8/97.
Cactus-Etter-Amarillo, Tex.: DBO wastewater treatment plant. CET Enviro.
Services’ Water
Quality Mgt.
$30m capital. Awarded 7/98.
Kyle, Tex.: 20-yr. lease DBO a l.5-mgd expansion of 4.5-mgd wastewater plant Aqua Source Cost NA. Signed early 1999.
San Antonio, Tex.: 10-yr. DBO surface water systems United Water Services $30m capital. Signed 3/25/98.
Seattle, Wash.: 15-yr. DBO w/two 5-yr. renewals for the 120-mgd Tolt River water filtration plant Camp Dresser &
McKee/Azurix/
Dillingham
$101m capital. Awarded 3/4/97.
Beverly Hills, Calif.: DBO water plant and municipal building Bidding Cost NA. Finalists selected.
Tampa Bay, Fla.: DBO 60-mgd surface water treatment plant Bidding $165m capital. USFOS selected preferred bidder 1/2000.
Chicago. Ill.: 20-yr. BOT 150-dry tpd biosolids pelletizing plant Bidding $360m capital. To be awarded early 2000.
Springfield, Mass.: DBO 43-mgd wastewater upgrade under 20-yr. OM&M Bidding $15m capital. Preferred bidder to be selected 3/2000.
Glens Falls, NY: DBO surface water filter plant, OM&M wastewater Bidding $6m capital. Earth Tech selected preferred bidder 1/2000.
Puerto Rico: DBO w/o 7 water plants Bidding $300m capital. First project bid 1/2000.
Newport, RI : 20-yr. DRO to upgrade 10.7-mgd wastewater plant, correct CSO Bidding Cost: NA. RFP: 10/99.
Quincy, Wash.: DBO water plant Bidding Cost: NA.
Seattle, Wash.: 15 to 25-yr. DBO Cedar River 240-mgd water plant Bidding $160m capital. Proposals due from three finalists 7/2000.
Halifax, N.S., Canada: DBO/F four wastewater plants, pipes Bidding $210m capital. RFP to three finalists 2/2000.
Phoenix, Ariz.: DBO 80-mgd 1st phase of Lake Pleasant surface water treatment plant and pipeline Planned $200m capital. RFQ: 2/2000.
Avalon, Calif.: DBO a 1.2-mgd replacement sewage treatment plant Planned $13m capital.
Sacramento, Calif.: DBO sludge process Planned Cost NA.
San Diego, Calif: BOT reclaimed water pipeline, effluent marketing Planned Cost NA. RFEl 11/99.
Fulton County, Ga.: DBO wastewater plant upgrade Planned Cost NA.
Sioux City, Iowa: 20-yr. DBO 30-mgd wastewater plant, pump, sludge Planned $42m capital; $3m O&M. REP 3/2000.
City of Lawrence, Mass.: DBO new water plant Planned $40m capital.
Pawtucket, RI: DBO water system Planned $30m to $60m capital. Studies underway.
El Paso, Tex.: DBO new 300 to 400-mgd surface water treatment plant Planned $500m capital. Studies underway.
Houston, Tex.: DBO new Northwest water plant and pipeline Planned $175m capital.
Vancouver, B.C., Canada: 20-yr. DBO 265-mgd Seymour water treatment plant Planned $80m capital. REQ by 5/2000.